Supply Dual cable reeler to Mine MantoVerde – Chile – (Komatsu)

A Dual Reel was supplied to MantoVerde Mine in July. The equipment was installed on the front loader and has a 6.5 metre long arm, a 450 metre cable reel, which is used to guide and move electrical cables in the mine.

Link copied!

The link has been copied to the clipboard.