FIRST-CLASS MINING ATTACHMENTS
Delivery of CRH450 Cable Reel to PESCO for Minera Escondida
Category:
29 October, 2025

We are pleased to announce the delivery of a CRH450 Cable Reel to our client PESCO, which will soon be deployed at Minera Escondida.
The CRH450 is a versatile piece of equipment, equipped with a 450-meter drum and a boom, capable of efficiently winding and unwinding cable, facilitating cable handling and movement tasks in the field. It is designed to optimize operations with maximum safety and reliability, ensuring excellent performance under demanding conditions.